Rah AFzar Tarh
Company overview
Products
Contents
Training Videos
Free Stuff
Site Map
Contact us
Support services
Home page
|
- Analysis of the longitudinal profile, up to three different
patterns for project lines
- Working with the longitudinal profile and cross section shapes graphically
- Possibility to define different templates of cross section shape
for a route, including road band, shoulder and passage bands,
ditches, retaining walls, stairs (in excavation); up to 5 stairs
can be defined having different dimensions
- Generation of new ground points along with respective cross
section shapes, by using surface linear gradient method
- Possibility to define different types of bridges along the route,
slab culvert, box culvert, slab bridge, siphon, arch culvert,
special bridge, overpass, etc.
- Up to three lines of project for analysis and comparison
- Graphical design of the longitudinal profile
- Real time calculation of volumetric calculations
- Checking of slopes, grades in longitudinal profile and cross sections
- Indicating icons for horizontal curves, bridges, and tunnels in cross section shapes
- Displaying of cross sections based on final shape and constructed shape
- Possibility to define vertical curves as circular and parabolic
- Automatic calculation of longitudinal profile of pipeline based on maximum allowable slope, and minimum ground elevation in right of way
- Possibility to define ditch in embankment and excavation conditions
- Possibility to define embankment slopes and up to five steps at each side
- Possibility to define excavation slopes and up to five steps at each side
- Possibility to define special kilometers for closing errors in form of gap or overlap
- Possibility to interpolate cross section shapes
- Possibility to define different types of bridges and drain pipes such as Siphon, slab culvert, box culvert, slab bridge, arch culvert, special bridge, infill slap bridge, and overpass
|
Back to Top
|
- Calculation of the bruckner curve points by considering the
cut and fill volumes, along with unsuitable cut volume, organic
soil (vegetable soil) volume, and the volume due to the settlement
of the soil after compaction
- Possibility to define up to 10 locations as the points of dumping
or borrowing ground Possibility to define up to 20 lines of distribution
- Analysis and calculation of the carrying length of soil in categories
of less than 100 meters, 200 m, 300 m, 400 m, 500 m and more,
and calculation of total average carrying length.
|
- Possibility to define up to 50 ground points at each side
- Possibility to define up to five different compaction layers (10 patterns)
- Possibility to define different layers of pavement, including Topeka, binder, black base, base, sub-base, and strengthening layer (10 patterns)
- Possibility to define organic soil (10 patterns)
- Possibility to define factors of soil shrinking and swelling
- Calculation of constructed volumes of cut and fill based on the progress of the project
- Calculation of volumes of final cut and fill volumes
- Calculation of volumes of different layers of compaction
- Calculation of areas under embankment condition
- Calculation of areas in excavation condition
- Calculation of volumes organic soil
- Calculation of different items of pavement layer
- Possibility to export calculated volumes and areas to Microsoft Excel for cost-estimate analysis
|
|