- Calculation of the bruckner curve points by considering the cut and fill volumes, along with
unsuitable cut volume, organic soil (vegetable soil) volume, and the volume due to the settlement of the soil after compaction
- Possibility to define up to 10 locations as the points of dumping or borrowing ground
- Possibility to define up to 20 lines of distribution
- Analysis and calculation of the carrying length of soil in categories of less than
100 meters, 200m, 300m, 400m, 500m and more, and calculation of total average carrying lenght.
|
Back to Top
|
- Calculation of cut volume based on different types of soil(mud, soft, hard, and rock) using
two methods of percentage, and depth
- Calculation of canal cut volume, based different types of soil(mud, soft, hard, roc, compacted)
using two methods of percentage, and depth
- Calculation of extra canal cut volumes (extra costs), based on different types of soil
(mud, soft, hard, rock, compacted) due to the canal depth, and water level
- Calculation of fill volume, based on normal fill area of section, along with stripping volume
and settlement volume
- Calculation of items relevant to grading, leveling, regulating, trimming and lining of canal
base and walls, edges of embankment, trenches etc.
|
|