- Possibility of performing Macro cost-estimate calculations for road construction based on the 1401 cost-estimate and new road types in the relevant cost-estimate
- Possibility of performing cross-section calculations based on the volume correction method in the 1401 cost-estimate (Road and Runway cost-estimate, page 17)
|
|
|
- Possibility of setting the superelevation of each berm separately in excavation conditions using the Section Optionals
|
- Possibility of setting the specifications of the brook at the top of the excavation through the Section Optionals, including the brook width, depth, and inner and outer slopes
|
|
- Possibility of setting the outer slope of the brook in embankment brook conditions through the Optionals
|
|
- Possibility of applying URSD patterns simultaneously in the cross-section as merged patterns (codes 201 to 300) and as shape-only drawings (codes 101 to 200)
|
- Possibility of considering and labeling the elevation difference between the constructed section and the project instead of the ground during the creation of Multi-Lateral Profile
- Possibility of displaying and printing solid hatching for the constructed cross-section in normal mode and longitudinal profile and cross-section display mode
|
|
|
- Possibility of generating a report of the points of each separated embankment layer in Full Reporting
|
- Possibility of displaying and printing the separated embankment layer lines in cross-section view in normal mode and longitudinal profile and cross-section display mode
|

|
|
- Possibility of printing the superelevation values of auxiliary bands and shoulders on the cross-section drawing in addition to the main band superelevation
|
- Possibility of displaying surveyed points along the alignment in plan mode in two groups and two colors
- Possibility of reading terrain cross-section information between existing sections while importing cross-section data points from a file
|
|